Village Wastewater System
Important Documents for the Grafton Village Wastewater Study
DRAFT – 90% Grafton Preliminary Engineering Report
60% Grafton Preliminary Engineering Report
12.18.2023 Letter from Seth Pajcic to Tighe & Bond –> Tighe & Bond Response Letter
12.18.2023 Selectboard Presentation
12.18.2023 Selectboard Recording
Complete_with_DocuSign_06140-2023-ARPA-VWWW-